268 tubular steel piles installed in record time

Per Aarsleff A/S executes piling work for the founda­tions for a new railway bridge at Minnesund north of Oslo. The bridge is part of the development of the Norwegian railway infrastructure on the Dovreba­nen line between Oslo and Hamar. The project com­prises approx. 4.5 kilometres of railway from Eidsvoll Nord to Langset. The Minnevika railway bridge will be 836 metres long, and we perform the piling work, temporary cofferdams as well as water regulation in the coffer­dams. Our work is carried out as a subcontract for PNC Norge.