New railway line Copenhagen-Ringsted

Per Aarsleff A/S carried out the largest single contract in terms of value for the new railway section between Copenhagen and Ringsted. The contract comprised a 3.7-kilometre-long section, and our work included the construction of 2 cut and cover tunnels of 560 metres and 695 metres as well as 4 bridges across the new railway section. The contract with Banedanmark was a design and build contract, so we were involved in the project already from the design phase.

Work done by Aarsleff Construction and Ground Engineering
and the Aarsleff company Wicotec Kirkebjerg A/S

See also