Groundwater lowering in the August Schade district near Copenhagen
Per Aarsleff A/S has lowered the groundwater in connection with the execution of a construction pit for a multi-storey building comprising apartments, hotel and grocery stores. The groundwater lowering included pumping wells, observation wells, monitoring wells and re-infiltration wells together with a 24-hour monitoring of the water level readings. As part of our work, we established an elevated pipeline system across Amagerfælledvej, a relatively busy road that we could not close off. To cause as little disturbance to the traffic as possible, the elevated pipeline system was carried out at night.
Work done by Aarsleff Piling