Geotechnical investigation for the New North Zealand Hospital
Aarsleff has carried out geotechncial, hydrogeological and environmental drillings for the preliminary design of a new hospital in North Zealand. We have executed a total of 140 geotechnical drillings on the 118,000-square metre area on which the hospital will be constructed. The drillings are 5-30 metres deep, and we used three drilling rigs at the same time for the drilling.
Work done by Aarsleff Piling
See also