Preliminary work in Copenhagen Airport

For the extension of Terminal 3 at Copenhagen Air­port, Aarsleff has carried out underpinning of part of the existing building. The project is carried out as part of the relocation of a service road which had to be moved before the extension of the terminal could begin. The underpinning was mainly carried out with Titan 73/35 self-drilling micropiles type as well as a small number of drilled DN508-millimetre piles, which were drilled along the existing column foundations and sub­sequently cast together with these.

Work done by Aarsleff Piling