Aarsleff has installed a record-breaking 72 metres vertical CIPP Lining in the Olympic Tower in Helsinki. The Public Works Department contacted Aarsleff and asked if our Aarsleff CIPP Lining could be the solution. We were honoured to be asked to work in one of the most well-known landmarks in Helsinki. First, the pipelines were cleaned, and the side connections were installed. Then, the liners went up to the top of the tower just like it was planned. The job took only 4 days including all the preparation works.