Deep compaction for new silos

Per Aarsleff A/S has carried out deep compaction on an area of 13.500 cubic metres at Port of Fredericia for the construction of eight grain silos and various buildings to be directly founded. The deep compaction is carried out with a PVE40VM vibrator and a tubular steel pile welded with vibro wings, an equilateral triangle with a side length of two metres.

Work done by Aarsleff Piling